广东茂名高新技术开发区热电联产项目
项目位于于广东省茂名高新技术开发区,概算投资7.53亿元,建设规模为 3台260t/h 高温高压循环流化床锅炉(其中一台为备用)配2台30MW汽轮 发电机组及辅助设备,并预留远期扩建两炉两机条件。
The project was launched in Maoming High-Tech Development Zone in Guangdong province, with a total investment a
bout 753 million RMB. The scale of the project is 3*260t/h High-temperature and High-pressure Circulating Fluidized-bed Boiler and 2*30MW back-pressure turbo-generator set.
设计效益Designed Benefits
供汽能力504吨/小时
Steam supply capacity of 504 tons per hour
年供汽量403万吨
Annual steam supply capacity 4.03 million tons
年发电量2.76亿千瓦时
Annual power generating capacity 276 million kwh